At the bottom of the user interface, you can track the revision status of the task list.

1.Log Tree
Here you can see the revision status of the task list to be executed. After an task has been completed, it is marked with a symbol that indicates whether the task was successfully completed:
Symbol |
Description |
|
The task was successfully completed. |
|
The task could not be performed. Check the messages in the Log Explorer to find and fix the error. You can export an overview of models whose revision failed as a csv file using Export names of failed models |
On the right side you will see the categorized program messages about the revision status with the structure: [Message category] Message. You can customize the colors for each message category under Settings, see Color settings for logging. You can change the text size by holding down the Ctrl key and scrolling with the mouse.
2.Show Disabled Tasks
Displays disabled tasks in the log tree.
3.Log Levels
Select the log levels to be displayed in the log tree.
–Trace
–Debug
–Info
–Warning
–Error
–Fatal
4.Enable Auto-Scroll
Enables auto-scroll as soon as new log lines are written. You can disable auto-scroll by manually scrolling or clicking in the log.